AMAZON “Last-Mile” Sorting Facility

The second logistics platform in Tuscany

The project occupies two distinct lots: the ‘building’ lot (20,100 sqm), housing the warehouse and employee car park, and the ‘overnight’ lot (11,800 sqm), designated as a parking area for vans used for outgoing deliveries.

The warehouse features a large service area on the south side for goods delivery, with six bays for articulated lorries and one bay for articulated lorries and vans. Each bay is equipped with an insulated portal, automatic sectional door, traffic-light system, wheel locking system, and automatic dock leveller.

On the east side, seven sectional doors connect the warehouse to the covered parking for outgoing vans. Goods entry and exit routes are therefore fully separated. The north side accommodates employees’ car park and the pedestrian entrance.

The weight-bearing structure is made of precast reinforced concrete, while the foundations consist of a grid of reinforced concrete wall beams supported by approximately 750 piles with a diameter of 600 mm, driven to a depth of 29 m.

The building and its systems are fully monitored and controlled via a Building Management System (BMS).

Project details
Year
2020
Location
Montacchiello (Pisa)
Site area

31,900 smq

Cost of the work
€ 11.000.000
Energy class
Project management

Crealink Srl

Case history

Featured projects

Contact us

Ready to start your next project?

Tell us about your project. We’re ready for the challenge.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.